 | 
Everest Summiter
Simone Moro reports in
Hi. Today it was very hard. We left camp
1 at 6100 meters very early in the morning and we climbed, as planned, over
7000 meters. There I deposited about 200 meters of rope, then I went back to
7000m to take more ropes and bring them up. Today our rucksacks were very
heavy (about 30 kilos per person) and after all this work we took 2 hours to
make a platform for our second camp at 7100 meters. Darek, who has 2
mattresses, went back down before reaching the second camp. So Piotr is
without a mattress and laid on our rucksacks. Fortunately I brought mine by
myself. The tent is not flat and we are very tired after this 12 hours of hard
work, but we are not able to sleep….! Tomorrow morning we will get up very
early, then we have to go down to bring up ropes that we deposited further
down. If our bodies allow it, then tomorrow we will fixing till the ridge,
hoping that we have enough rope…..
Ciao and follow us also tomorrow
Simone (by satellitephone)
|
 |
|
Pictures copyright
Simone Moro |
Ciao and keep
in touch, Simone
Next dispatch >>>
 |
The Team:
Componenti Spedizione Shisha Pangma 8027 in invernale – parete sud
Simone Moro ITA
Piotr Morawski POL
Jacek Jawien POL
Darek Zaluski (cameraman e alpinista) POL
Jas Szulc (logista)POL
|
 |
Altitech2:
Digital Altimeter, Barometer, Compass and Thermometer. Time/Date/Alarms.
Chronograph with 24 hour working range. Timer with stop, repeat and up
function. Rotating Bezel. Leveling bubble. Carabiner latch. E.L. 3 second
backlight. Water resistant. 4" x 2-1/4" x 3/4" 2 oz. Requires 1 CR2032
battery.
See more here. |
|
|

|
|  |