|
We received phone call
from Martine Larroque, her laptop has crashed, so
she is not able to send regular updates. She will be
getting a new laptop in couple of days with the help
of France telecom. Regular updates will be available
very soon. Latest Updates given by Martine is as
below.
Everyone
wonders what happened at the base camp. After 10
days of trekking, I have reached the base camp. I
am the first westerner to reach base camp. It
was a huge construction site with all yellow tents,
getting ready for expeditions. The first few days
were dedicated to organize tents and to make them as
much comfortable as possible for coming two months.
Here at 5300 meter it's very dangerous, so need to
be very careful at every step. In morning mountains
look very beautiful and from my tent I have the best
view in the world. The Khumbu icefall looks like a
giant crystal. As soon as the weather turns bad, we
take refuge in the mess tent. The weather is so cold
here that we put gas stove (heater) under the table
to get warm. In morning it's so cold that my
toothpaste and all other things inside the tent gets
frozen and i need to defreeze them before using. The
temperature is below 18 degree centigrade. Today
it's April first, expedition has started to arrive
and I can see more life at the base camp. I expect
my fellow climbers who share the same facilities to
arrive in some next days.
Dispatches
|
|