 | 
Current Pakistan Time

Dispatch
July 06 update from Field Touring office: The
latest news is that the team is between camps 2 and 4 and are preparing for
the summit bids within 12-24 hours.
As far as we are aware everything is
proceeding as planned and the weather has been accommodating the schedule.
We will post the much awaited due satellite
dispatch the minute we receive it, we are expecting it within 36-48 hours.
(Wednesday 09 July Pakistan time) Cheers, Dave Hancock, Field touring office,
Perth Australia
The team
include climbers such as Everest Summiter Julen Reketa.
 |
Julen Reketa, Basque:
Born in Laudio, Alava,
Basque Country, Julen's impressive climbing resume includes; 1996
Tajikistan Expedition, Pico Voroviev 5.691 m, Pico Chetyrekh 6.299 m,
Korgenevskaia 7.105 m. 1997 Expedition Cordillera Blanca, Perú, Urus
5.450 m, Ishinca 5.520 m, Huascarán 6.768 m, Artesonraju 6.025m South
Face. 1998 Expedition al Tien-Shan, Kirguizia, Pico Poveda 7.439 m,
1st ascent. 1999 Expedition Gasherbrun II 8.035m, Karakorum Pakistan,
2001 Everest 8.048m Expedition, With oxygen |
Dispatches
|
|
 |
Altitech2:
Digital Altimeter, Barometer, Compass and Thermometer. Time/Date/Alarms.
Chronograph with 24 hour working range. Timer with stop, repeat and up
function. Rotating Bezel. Leveling bubble. Carabiner latch. E.L. 3 second
backlight. Water resistant. 4" x 2-1/4" x 3/4" 2 oz. Requires 1 CR2032
battery.
See more here. |
|
|

|
|  |